Sunday, August 13, 2017

Life Happens and the ceiling is tops!

8-13-17 Life happens...
The tongue and groove walls and ceilings are slow going, but getting done. Life happened and we had to delay some building. We are back on track and working through the 100 degree heat to install the tongue and groove walls and ceilings.  The living area walls are complete with the installation of the 1 x 8 x16 pine T&G.  The North side of the ceiling from the wall to the center beam was finished today.

Left to do: trim.  We have had a long standing discussion on the color of the trim. Matching or working out the colors of all the permanent fixtures, floor, walls, trim, etc. is difficult.  Hours of discussion go into deciding on staining, painting, tile or wood floors. Today we decided (again) to go with paint on the floors. We will let you see how that goes when we get to that juncture.