Monday, August 29, 2016

DAY 43-44 Installing interior framing - more changes

DAY 43-44 Interior begins

Now the real work begins!  For us anyway. The builder has almost finished exterior framing, roof and walls. We are just missing a few minor finishes.  So now begins our two man (one man, one woman) interior construction job.

Day 43-44 was spent putting up about 30 framed boxes that will hold the ceiling joists giving us 10' walls through out the house.



The boxes were originally going to be fewer and larger, but the exterior frame went up in such a way that we had to change plans. With teamwork, my husband and I made them all and they all fit! It took quite a bit longer to make all the boxes, every one a different size. But they are done and installed. 
 





Sam loves that the windows are just his height so he can keep watch!
MORE CHANGES:

After checking measurements for built-in kennels in laundry, we decided to move the 6" wall back a foot. This will give us about 2'+  space from the door framing to the wall. At first thought, with the plumbing pipe already in the foundation, we thought it would not be possible. But it will work out great and opening the laundry room a bit will really help. Since the back entry will be through that room, it just made since to make the change.   It will take a foot away from the large second bedroom, but that won't be missed. We will be adding one wall that will enclose the pipe, but we will gain a much better floor plan.

Planning the exterior lights we decided not to put any electrical wiring in the underpinning over the porches.  So we called the electrician and put him on hold.  We will be installing wall sconces along the porch and beside each door. There will also be one antique gooseneck light above the front door for additional available lighting.  No ceiling fans on the porches.. just don't make since when it just circulates the 100 degree heat.

Addition:  Needing a project (to keep me out of his way??) I have begun design and fabrication of shutters for the windows.  Still in the planning stages, looking at cedar with stain or clear coat to maintain a darker brown color over time.  Here is the test. He is checking my measurements! color is way to lite.


Wednesday, August 24, 2016

DAY 40 - All walls up and roof is on

DAY 40

We have a roof!

Today the 3rd and 4th walls and roof were installed. Next few days will involve installation of the ridge cap, underpinning and more trim.

The front, better known as the "nightware wall" by our builder.  But, they are doing a fantastic job! Thank you Huff Welding.



Monday, August 22, 2016

DAY 38 - Exterior walls - antique barn door hardware

DAY 38

Every day we have rain, lots of rain. Today was first chance to start install of exterior sheet metal. Looks like a good match to the coupala.




Got a great deal on some antique barn door rollers through Instagram! These will be used on door to master bathroom.
8/22/16

Tuesday, August 16, 2016

DAY 29 - Door install

DAY 29 - Door install - kinda

Started and finished staining large entry door with sidelights. The smaller side door was purchased already stained(door company mistake).  The front entry door was stained with Early American Minwax stain and covered with clear polyurethane.   Racing the rain..again.




Side door install proved to be more of a test of nerves than originally thought. But it is in. 
Note: you tube videos are a wealth of information!                                      
 Front entry door was a breeze!


 And then it rained and rained and rained and rained.
                                                            If we get a dry day the sheet metal install will get started.
8/13/16

Tuesday, August 9, 2016

DAY 20 - Windows in

DAY 20 - Windows in!

Today the windows were installed into the frame. We purchased aluminum frame, double glaze, Low e, argon fill, clear windows from Home Depot. After pickup, haul, loading and unloading twice and installation we ended up with one crack. It may not be the last. Some adjustment was made to the large window height due to the framing which lowered them slightly. They will still be 22"+ above the floor.






Now that installation of the windows is complete we wait for the order of exterior sheet metal. Here is the color we chose. We anticipate installation in about 2 weeks.




Next: in a few days we will install the doors. This is the side door.   The front door has two side windows.



Tuesday, August 2, 2016

DAY 14 - framing and cupola install

DAY 14 - Starting to really see the frame of the house!

Framing is almost finished and ready for exterior steel panel walls.  Those exterior panels will be ordered in next few days. Window framing will be finished tomorrow.  We will not be installing additional wood framed walls on the interior, so extra supports are being included in the steel framing approximately every 4'.

 Cupola was hoisted up to the top and installed. Weather vane will be installed at a later date.