DAYS 57- to month No. 2 Interior walls


Here we are at DAYS 57-58

The builder, Huff Welding, finished most of the outside. The underpinning for the side porch looks great! They also installed the wind vane for us. So glad we didn't have to figure out how to get up there!! They will come back when we have the front porch ready for underpinning and wood burning stove stack ready to install.













LOOKS GREAT!!










We are pre fabricating the walls in sections inside the house and have installed the two 6" wall sections for the laundry room and the small 1/2 bath. Not as heavy to lift as we thought. Laundry wall includes cut outs for dryer vent to outside wall. All walls will be bolted to the foundation.

Bathroom and laundry walls - 6"





Next,  the framing is complete for the interior walls within the master bathroom. There are two interior 8' walls separating out the shower and toilet. These walls are 8' leaving ventilation space to the remaining areas of the bathroom. The ceilings will be 10'. Door for master bath is a 80 x 30 opening. We will be fabricating a sliding barn door with reclaimed wood and barn door rollers for opening and closing off bathroom.




Now we can see shape of master bedroom(lft), master bath and 2nd bedroom(rt)



Hummingbirds are passing through town!

The cedar shutters are coming along. Using cedar fencing to reduce cost and increase ease of construction. All will be covered with a clear polyurethane which adds a nice color to them.  Here are a few photos. First photo is of back side.  Each shutter will have 3 panels and angled cross support. We are still working on the process for attaching them to the house.  Note: scorpion stings HURT!




Next up: hallway walls, finish shutters, getting really close to contacting electrician and A/C man!
9/18/16