Moving right along

  This last week has been exciting!  

  We are moving right along with our preparations for the electricity installation and heat pump install.  To have everything ready for the electrician we needed to finish attaching 2" wide wood strips to the metal wall supports.  This will enable the electrician to place all the junction boxes where they need to go. We had a walk thru with our electrician and feel confident he will do a great job.

  The electrical rough-in is this week!  Although this weekend was nice and cool 50 - 60 degrees, the heat is coming!!

  Since we have purchased the outdoor lights, they can be installed this week. We are very excited about this because we almost finished installing the shutters. Once the lights are installed we will just about have a finished exterior.




Here are photos of updated exterior with shutters on side complete!



The shutters were a bit of a pain. Each one took a bit more time than we expected. But then most everything usually does. 😊

  With the "R" panel sheet metal "hills and valleys" we had to insert 1" thick spacers strategically behind each shutter so that they were secure and flat against the panels. Occasionally, we had a bolt in a seam of the panel that required a slight cut out on the backside of the shutter. Using carriage bolts we secured the shutters nice and tight.

  We have two lower windows and the three upper windows on the front to finish another day.

  They look terrific and we installed all the ones the electrician will need to help him place the outside lights.










Wall strips installed above and below all windows and on all upright wall supports. The tongue and groove wood planks for the walls will be nailed right into those boards. We chose this route instead of installing another framed wall to keep the depth of the walls and window frames to a more desirable size.





 We are starting to be able to purchase interior items. The small bathroom dresser/vanity is being refinished and we placed our blue and white vessel sink on top and it looks fantastic. The copper exposed plumbing with the blue handles will look great too!

 The trees think it is Spring already!


Thursday, December 8, 2016

Back to business

12-8-16 update

Beams up an installed over 1/2 of the house - bedrooms, bathrooms, washroom


The beams over the living area are a work in progress. 
Each 20' beam is being lifted and installed by myself and my husband. No small feat!  


Sunday, November 27, 2016

Break for Deer Season

Just a quick post :: After our Break for Deer Season and our First Annual Thanksgiving Family Dinner, we are getting back to building.

The rafters are going in slowly and carefully. Ladders don't take kindly to your knees after continual usage. Never the less, as of today, we have rafters up and over 1/4 of the rooms.

Oh and deer season went well:



Tuesday, September 27, 2016

Month No 2 ends: walls

Walls, walls and more walls

Moving right along on this one man job.  The walls are going up pretty quickly and easily. We are due for a cool front and it can't come fast enough. Without insulation it can get pretty hot in there. Here are a few photos of the additional walls which completes the Master Bath, Master bedroom and almost the hallway. Sam is in the first photo.. trying to take some credit for all the hard work.



Photos from atop the scaffolding





It's no easy task climbing up there! and it is way up there. 




CHANGE:  decided to move the hot water heater to the attic to improve on the installation and run pipes to exterior back side of the house.

UPDATE: Shutters are 80% done.  They are all built, but ran out of polyurethane.

INTERESTING: the El Camino - The Texas Gravel Adventure bike race ran right by us. On a 90 degree day, those brave riders had more than gravel to contend with.


Being as hopeful as we can for nice cool Fall weather






Monday, September 19, 2016

DAYS 57- to month No. 2 Interior walls


Here we are at DAYS 57-58

The builder, Huff Welding, finished most of the outside. The underpinning for the side porch looks great! They also installed the wind vane for us. So glad we didn't have to figure out how to get up there!! They will come back when we have the front porch ready for underpinning and wood burning stove stack ready to install.













LOOKS GREAT!!










We are pre fabricating the walls in sections inside the house and have installed the two 6" wall sections for the laundry room and the small 1/2 bath. Not as heavy to lift as we thought. Laundry wall includes cut outs for dryer vent to outside wall. All walls will be bolted to the foundation.

Bathroom and laundry walls - 6"





Next,  the framing is complete for the interior walls within the master bathroom. There are two interior 8' walls separating out the shower and toilet. These walls are 8' leaving ventilation space to the remaining areas of the bathroom. The ceilings will be 10'. Door for master bath is a 80 x 30 opening. We will be fabricating a sliding barn door with reclaimed wood and barn door rollers for opening and closing off bathroom.




Now we can see shape of master bedroom(lft), master bath and 2nd bedroom(rt)



Hummingbirds are passing through town!

The cedar shutters are coming along. Using cedar fencing to reduce cost and increase ease of construction. All will be covered with a clear polyurethane which adds a nice color to them.  Here are a few photos. First photo is of back side.  Each shutter will have 3 panels and angled cross support. We are still working on the process for attaching them to the house.  Note: scorpion stings HURT!




Next up: hallway walls, finish shutters, getting really close to contacting electrician and A/C man!